HHS Construction Photos |
-4/23/2020 Video of Holmen High School Addition 1
-4/23/2020 Video of Holmen High School Addition 2
-4/23/2020 Video of Career Technology Area Construction
-1/6/2020 Video of Construction Site
-1/6/2020 Video of Wrestling Room & Fine Arts Center
|
|
Drone Photos 1/6/2020 |
|
|
North End Development 1/6/20 This is the north end of the new construction project. The gymnastics area is the brick area on the right. The Fine Arts Center is the open brick area on the left. The wrestling room is the space shown with the crane and Lull lifts. The new locker room area is the portion that appears to have a tin roof and the weight room wall stands alone at the bottom. |
|
|
|
CTE Addition 1/6/20 This picture shows the outline of the addition to the Career Technology Education (CTE) area. |
|
|
|
Fine Arts Center 1/6/20 This picture shows the construction of the Fine Arts Center looking towards the stage area. |
|
|
|
Multipurpose Gym Space 1/6/20 This picture shows construction of the new multipurpose gymnasium space (gymnastics area). |
|
|
|
HHS Construction 1/6/20 This picture includes the Fine Arts Center (left), wrestling space (center), and a portion of the locker room (right). |
|
|
|
HHS Construction 1/6/20 The weight room wall is on the left of this picture. The existing weight room can be seen to the right of the structure with the metal roof (new locker room area). |
|
|
|
Fine Arts Center (Backside) 1/6/20 This picture shows the Fine Arts Center from behind the stage area to the seating and lobby areas. The music spaces can be seen towards the bottom of the picture. |
|
|
|
Athletic Training Area 1/6/20 The footings can be seen for the new athletic training area in this picture below the gymnastics space. |
|
|
|
|
|
|
Last Updated: 4/24/20 |
|
|